Infrastructure & incentives

 Adjacent Infrastructure

• An Internal Container Deport (ICD) has been completed and operation

• Access road from Mai-Mahiu – Narok road to the ICD and a meter gauge railway connecting he ICD to the old meter gauge railway at Longonot (25km) are complete and operational.

Internal Utilities Infrastructure

• Construction of Special Economic Zones Authority administration building, boundary wall and access road are ongoing

• Construction of water pipeline (50km), pump stations, booster pump and water storage facilities (gravity tank 4500 cubic meters, site tank 450 cubic meters) has been completed. The pipeline has a capacity of 8000 cubic meters per day.

• 11KV power line has been constructed while a 66KV substation is under construction

• Land sub-division and preparation of Registry Index Map (RIM) has been completed

Power Tarriffs

The government has established a preferential power tarriff of $0.05/KWh for the zone.

One Stop Shop at the Naivasha SEZ

The One Stop Shop (OSS) will be formed in cooperation with various agencies & stakeholders for services to be offered under one roof under the Special Economic Zones Authority. 

 Services offered by OSS: Odoo • Text and Image
Odoo • Text and Image
Odoo • Text and Image


Plans are under way to build the Naivasha SEZ Admistration building that will subsequently host One Stop Service offices
Odoo • Text and Image